My shortlist (0 item)

    Duraflex EcoPress pressure maintaining system for expansion control at Fiona Stanley Hospital

    Automatic Heating

    Automatic Heating  installed Duraflex EcoPress pressure maintaining stations at Fiona Stanley Hospital to control the expansion of heating, cooling and condenser water systems.

    Mechanical consultants AECOM, who were responsible for designing the HVAC systems at Fiona Stanley Hospital, called upon the extensive experience of Automatic Heating for expansion control.

    Duraflex EcoPress pressure maintaining stations offer considerable advantages over conventional expansion tanks for large volume HVAC systems.

    Key benefits:

    • Maintains system pressure within 50kPa
    • Automatically provides make up water
    • Provides outputs to BMS systems
    • De-aerates content water
    EcoPress installations:

    • Royal Children’s Hospital, Melbourne VIC
    • QE II Hospital, Perth WA
    • Melbourne Markets, VIC
    • Bond St, Sydney NSW

     

    Please correct the errors and try again.

    You May Also Like:


    Related News

    View All

    Contact Automatic Heating

    CONTACT
    • 67 Gateway Boulevard
    • Epping
    • VIC 3076
    • Click to show

      03 933 ...

    • Fax: 03 9310 5655
    • Visit Website
    Back to Top