
Case study: Haupai Bridge, Auckland
Designed and engineered by Bluebarn Consulting and constructed by Oxcon.CLL, the new Huapai Bridge creates a connection between the Huapai Triangle Special Housing development and the Huapai Commercial area. As safety and compliance were top priorities, the project called for a handrail and balustrade solution that was structurally sound and met all the necessary regulatory requirements.Designed and engineered by Bluebarn Consulting and constructed by Oxcon.CLL, the new Huapai Bridge creates a connection between the Huapai Triangle Special Housing development and the Huapai Commercial area. A maximum total of 1200 dwellings applies across the precinct.
As safety and compliance were top priorities, the project called for a handrail and balustrade solution that was structurally sound and met all the necessary regulatory requirements. A local supplier was also preferred to not only support the local economy, but also ensure stock availability to meet tight construction deadlines.

Case study: Haupai Bridge, Auckland
Download this case study to find out more.
- Popular Articles