Logo
Sign Up
Forge Case Study Ian Stromborg Play Space Hero

Case study: Ian Stromborg Play Space

Paul Keating Park’s 20-year masterplan included the Ian Stromborg Play Space, featuring 4–6m high Banksia Pod structures. FORGE, working with Regal Innovations and ASPECT Studios, delivered the final design, fabrication, and installation. The playground officially opened in July 2024.

Architecture & Design Team
Architecture & Design Team

10 Jun 2025 1m read View Author

Forge Case Study Ian Stromborg Play Space Cover
Case study: Ian Stromborg Play Space

Download this case study to explore how thoughtful design and expert craftsmanship can transform public spaces.

Forge Banner
  • Popular Articles
  • Outdoor fabric
  • Moddex Ezibilt™ ramp and balustrade solutions
  • Image: Bushfire in NSW / ImageSourceCur
  • Image: The Matthews Architects team in 2025 / supplied