
Case study: Ian Stromborg Play Space
Paul Keating Park’s 20-year masterplan included the Ian Stromborg Play Space, featuring 4–6m high Banksia Pod structures. FORGE, working with Regal Innovations and ASPECT Studios, delivered the final design, fabrication, and installation. The playground officially opened in July 2024.

Case study: Ian Stromborg Play Space
Download this case study to explore how thoughtful design and expert craftsmanship can transform public spaces.
- Popular Articles