Logo
​
Sign Up
Promat 33 Alfred Street Circular Quay

Architecture & Design Team

Architecture & Design Team

06 Jul 2026 • 2m read • View Author

Fire resistance in concrete structures: Lightweight solutions for building refurbishment under NCC 2025
Fire resistance in concrete structures: Lightweight solutions for building refurbishment under NCC 2025
Promat Australia
Promat Australia
View Listing
Promat Australia

Related Articles

Promat Case Study: AMP Building, 33 Alfred Street, Sydney Newsletter

Resources

Case study: AMP Building, 33 Alfred Street, Sydney

Promat’s CAFCO 300 spray applied passive fire protection reinstated the 120/120/120 Fire Resistance Level (FRL) for 20,0...

PROMATECT-H boards: Built to survive earthquake and fire

Product News

PROMATECT-H boards: Built to survive earthquake and fire

Promat’s PROMATECT-H fireproof boards successfully maintained passive fire protection capabilities following severe seis...

Promat spray coating meets fire resistance requirements at Adelaide Convention Centre

Product News

Promat spray coating meets fire resistance requirements at Adelaide Convention Centre

The Building Code of Australia’s (BCA) deemed to satisfy requirements stipulated all steelwork to have fire resistance of...

Promat’s intumescent coating provides fire protection to Hong Kong residential building

Product News

Promat’s intumescent coating provides fire protection to Hong Kong residential building

Promat’s Cafco SPRAYFILM WB3 water-based intumescent coating provided 120 minutes of fire resistance (BS 476: Part 21) t...