My shortlist (0 item)

    Rondo supplies drywalls and ceiling systems to Macau casino and hotel

    Rondo

    Several Rondo products were specified for the new $2.1 billion (USD) City of Dreams project in Macau.

    Featuring a 420,000-square-foot casino, and a diverse array of accommodation consisting of the Crown Towers and the exciting music-inspired Hard Rock Hotel, the project was developed by Melco Crown Entertainment with Leighton-China State-John Holland Joint Venture serving as the managing contractor.  

    Project highlights include over 20 restaurants and bars, some of the world's most sought-after retail brands within The Boulevard, a unique lifestyle precinct operated by leading travel retailer DFS, and the iconic audio visual multimedia extravaganza, Dragon's Treasure, featured in a dome-shaped theatre known as The Bubble, completing the line-up.

    Rondo products used for the project included QUIET STUD sound insulation system, DUO exposed grid ceiling systems, WALK-ABOUT trafficable ceiling system, and steel stud drywall framing system.

    Rondo was also the site-wide supplier for drywalls throughout the project. The Rondo Malaysia team played a major role in the successful execution of the project by arranging and loading 35 containers a month, replying to dozens of technical enquiries every week and running the factory 24 hours a day to ensure they had the coils to keep the machines running.

    Contact Rondo
    Please correct the errors and try again.

    Related News

    View All

    Related Resources

    View All

    Contact Rondo

    Contact Rondo
    Please correct the errors and try again.

    CONTACT
    • 57-87 Lockwood Road
    • Erskine
    • NSW 2759
    • Click to show

      1300 3 ...

    • Fax: 02 9912 7310
    • Visit Website
    Back to Top