My shortlist (0 item)

    Royal Adelaide Hospital extension features Galvin’s taps and drains

    Galvin Engineering

    Several products from Galvin Engineering were specified for the Royal Adelaide Hospital Sports Medicine Extension (SA) project.

    Designed by Hassell, the sports hospital project encompassed the demolition of the existing warehouse, basement carpark extension of 22 spaces, addition of 16 beds to the first floor, expansion of toilets in the recovery ward, and a new operating theatre.

    Galvin products specified and installed for the Royal Adelaide Hospital Sports Medicine Extension (SA) project included Flowmatic electronic taps, pre-rinses and floor drains.

    Please correct the errors and try again.

    Related News

    View All

    Related Resources

    View All

    Contact Galvin Engineering

    Please correct the errors and try again.

    CONTACT
    • 410 Victoria Rd
    • PO Box 2063
    • Malaga
    • WA 6090
    • Click to show

      08 924 ...

    • Fax: 08 9249 5916
    • Visit Website
    Back to Top