    Ezytube the Column Forming Tube Experts in Pour Down and Pour Up Concrete Technology

    “Pouring Down” is a process whereby the formwork for the beam and concrete slab are formed first, the column forms are installed simultaneously and significant time savings are possible as a result.

    Ezytube round, square, rectangular or custom shaped for “Pour Down” or “Pour Up”

    • Allows safer access to the top of the column for pouring the concrete 
    • Greater versatility in concrete pump organisation
    • Generally 1-2 days saving per pour cycle per area
    • The tube requires very little bracing and work does not stop while waiting for the columns to set

    This process also means that the tube requires very little bracing and work does not stop while waiting for the columns to set.