Erosion Protection Systems  was contracted to install its concrete mattress products to a channel on a power station located near Wagga Wagga in NSW.

The concrete filled mattress was utilised to stabilise the base and slopes of the channel. This style of revetment system is ideal due to its speed of installation and low cost.

The project was completed in less than 5 days and resulted in significant savings to the client.

Erosion Protection Systems is run by a qualified civil engineer with 24 years experience with concrete mattress products.