My shortlist (0 item)

    ACO PowerDrain S300K trench drain system installed at Pacific Highway upgrade project

    ACO Polycrete

    ACO Polycrete  supplied its PowerDrain S300K trench drain system with slotted ductile iron grates for the Banora Point Upgrade project along the Pacific Highway in New South Wales.

    The $321m project is in a busy urban setting that will provide a freeway link between the Chinderah Bypass and Tweed Heads.

    Located along a heavy traffic section of the Pacific Highway, the Banora Point Upgrade project involved the construction of a 2.5km six-lane divided highway with a major viaduct, land bridge and interchanges at both ends.

    ACO’s PowerDrain S300K trench drain system featuring slotted ductile iron grates was installed by the project designers to drain a reduced shoulder width, ensuring all surface water was captured quickly and preventing any part of the ponding from encroaching into the traffic lanes.
    Contact ACO Polycrete
    Please correct the errors and try again.

    You May Also Like:


    Related News

    View All

    Related Resources

    View All
    Back to Top