My shortlist (0 item)

    ZEGO is an Australian family owned company and industry leader in the manufacture and supply of insulated concrete forms. formwork and alternative wall building systems since 2001.

    ZEGO ICF's offer an ideal alternative to conventional building systems; a sustainable energy efficient and faster way to build the walls of a residential or commercial building. 

    Now offering ZlabFORM, an insulated and fully integrated suspended flooring system, ZEGO provides the whole super structure of your building quickly and efficiently.

    Please correct the errors and try again.

    View More

    Frequently Asked Questions

    The base is formed as a slab, install hydrostatic valve and pipework, place reinforcement as per engineering drawings ( you can download pool engineering drawings by registering and logging back in ) Place starter bars to the perimeter and then pour the slab with or without slope for shallow and deep end. it’s your choice.
    The reinforced concrete core is the load bearing wall and the ZEGO is simply stay in place form work for casting the concrete to the engineers specification for your structure.
    Make sure first that you have good drainage behind the wall. Yes you then simply apply your preferred acrylic tile adhesive, then lay your tiles, grout up your joints and clean up.
    Reinforced Acrylic Render ( with or without texture) is the most commonly used finish and will provide an impact resistance surface able to resist all normal treatment associated with domestic and commercial constructions. Installation Firstly, brush down the surface to remove any debris Trowel on 4mm of base coat acrylic render (render to comply with CA26 Compliance) Roll out the reinforcement mesh for the render and trowel onto the surface Do not staple the mesh to the wall Overlap the slabs edge by 50mm minimum Cut 45 deg from the corner of the window openings Measure the reveal back to the windows, then measure, cut the mesh and fold back onto the reveals Ensure you reinforce the corners with additional reinforcement mesh Trowel on another 4mm of base coat On completion, an 8mm base coat with reinforcement mesh in the center for impact resistance
    Yes and this is simple to do. Here are a couple of examples. – Prior to plaster boarding the walls simply remove the foam surface and this will make a recess. Plaster the recess and you have a nice niche for artwork, photo frames etc. – If you require a deeper niche, simply place form work to form the niche prior to concreting – If you require downlights or uplights to the opening you again form out for these

    Other Addresses

    • G.P.O. Box 4774
    • Sydney
    • NSW 2001
    • Click to show

      1300 1 ...

    • Fax: 02 9651 2477

    ZEGO Building Systems Brands

    FireFORM

    HomeFORM

    ReFORM

    Z-Board

    ZlabFORM

    ConFORM

    Wall Brace Australia

    Back to Top